B-VER HARDENER BV29

Description

B-VER BV29 Colour Hardener is a ready to use dry silica quartz mineral aggregate, suitable for finishing, hardening and coluring over fleshly floated and leveled concrete flatwork where the surface is required to be stamped or stenciled.

Use

B-VER BV29 Colour Hardener is suitable for both interior and exterior and where areas require additional wear resistance

such as:-

Ø Car park/entrance of Bungalows

Ø Main entrance of Hotels and Condominium

Ø Swimming Pool Deck

Ø Pavement Walks

Materials Composition

B-VER BV29 Colour Hardener consist of hard wearing silica quartz mineral of property sizes and graded aggregate, dispersing agents,strength promoter and cement binder. Whenavailable in colours, the pigments which are integrand uniformly and have good UV resistance.

Packing

B-VER BV29 Colour Hardener is packed in 40 Kg/bag.

Shelf Life

Under normal conditions and kept dry the shelf life of the surface hardener is at least 6 months from the date of manufacture.

Colours

B-VER BV 29 Colour Hardener is ready available in a wide range of colours, where customized colour is requires the colour

hardener can also be formulated to specification with sufficient prior notification and quantities.

Properties

v Compressive strength at 28days: 65n/mm.

v Abrasion resistance is 200% great than plain concrete

v Hardener of aggregate is Moh’s scale 7

Rate of Use

3 to 4kg/m2

Application

After the concrete has been screed, consolidate and further level by bull float and any free water has evaporated or

been removed, the surface should be floated by hand or bull floated. Immediately following this floating operation, shake

the B-VER Colour Hardener by and over the surface. The first application of the B-VER olour Hardener should use

about 2/3 of the total amount needed. The dry shake material will absorb some moisture from the freshly prepared

concrete and should than be thoroughly floated into the surface, preferably by a bull loat immediately after this the

remainder of the specified amount of the B-VER Colour Hardener should be distributed evenly over the surface at right

angles to the previous application. This should be thoroughly floated and take part of the surface taking care that a

uniform colours is obtained. Final toweling is best done by hand.

Protection

The finished floor shall be protected and heavy traffic shall be avoided for approximately 28 days.

The Contractor or principal shall take necessary steps to protect the finishes floor from damage by other trades.

The representation and recommendation regarding the product are based on test, which we believe are reliable.

We cannot accept responsibility or guarantee of success of your work as we have no influence or control over

the method of application, site condition etc.